Project Duration
January 2023 – September 2024 (21 months)
Team
18 employees led by Chief Engineer: Dr. Elena Ivanov
Estimated Cost
$1.8 million
The Big Heat Pump Company was responsible for supplying and Installing two OCHSNER Air 41 heat pumps as part of the decarbonisation project at St Peter Mancroft Church in Norwich city centre. We left space for additional heat pumps if the churches heating needs expand in the future.
Identify security risks and system vulnerabilities (3 months)
Develop architecture for threat detection and endpoint security (4 months)
Deploy firewalls, sensors, and automated response tools (6 months)
Perform penetration tests and fine-tune the platform (4 months)
Educate employees and provide manuals (2 months)
Full deployment with ongoing maintenance (2 months)
Industrial environments face an increasing risk of cyberattacks targeting critical infrastructure, which can disrupt operations, compromise sensitive data, and cause significant financial losses.
Protects public safety by safeguarding critical industries such as energy, water, and manufacturing, ensuring the continuity of essential services.
The platform increases operational resilience, minimizes downtime caused by cyber incidents, and ensures the confidentiality and integrity of industrial data.