St Peter Mancroft CofE Church Norwich

/
Info About Project
/

Project Duration

January 2023 – September 2024 (21 months)

Team

18 employees led by Chief Engineer: Dr. Elena Ivanov

Estimated Cost

$1.8 million

/
Overview
/

The Big Heat Pump Company was responsible for supplying and Installing two OCHSNER Air 41 heat pumps as part of the decarbonisation project at St Peter Mancroft Church in Norwich city centre. We left space for additional heat pumps if the churches heating needs expand in the future.

/
Key Features
/
  • Real-Time Threat Detection: Identifies and mitigates cybersecurity risks in real time using AI-powered tools.
  • Endpoint Protection: Secures IoT devices, sensors, and machinery within industrial networks.
  • Firewall and Network Segmentation: Protects against both external and internal threats with multi-layered security.
  • Compliance Management: Supports ISO 27001, NIST, and other industry standards for cybersecurity.
  • Incident Response Automation: Provides automated tools for rapid threat isolation and recovery.
/
Project Stages
/
01
Requirement Analysis

Identify security risks and system vulnerabilities (3 months)

02
Platform Design

Develop architecture for threat detection and endpoint security (4 months)

03
Implementation

Deploy firewalls, sensors, and automated response tools (6 months)

04
Testing and Optimization

Perform penetration tests and fine-tune the platform (4 months)

05
Training and Documentation

Educate employees and provide manuals (2 months)

06
Launch and Support

Full deployment with ongoing maintenance (2 months)

/
Problem Solved
/

Industrial environments face an increasing risk of cyberattacks targeting critical infrastructure, which can disrupt operations, compromise sensitive data, and cause significant financial losses.

/
Benefits to Society
/

Protects public safety by safeguarding critical industries such as energy, water, and manufacturing, ensuring the continuity of essential services.

/
Impact
/

The platform increases operational resilience, minimizes downtime caused by cyber incidents, and ensures the confidentiality and integrity of industrial data.

Showcasing Our Engineering Expertise

As part of a full restoration of a beautiful London townhouse, The Big Heat Pump Company delivered a flawless installation of stylish new radiators that perfectly complement the fresh interior design. Blending form and function, the radiators not only provide efficient heating but also enhance each room with their sleek, modern look. The team’s expert workmanship is evident throughout, with clean pipework and thoughtful placement that harmonises effortlessly with the home's aesthetic. Alongside the radiators, The Big Heat Pump Company also installed an air source heat pump, bringing sustainable, low-carbon heating to this elegant period property.

View more
portrait

Cambridge House – A Complete Renewable Revamp Cambridge House underwent a full renewable energy overhaul, featuring the OCHSNER Air 18 heat pump, known for its super-quiet operation and exceptional efficiency. Perfectly suited for this energy-conscious homeowner with discerning taste, the OCHSNER system was an ideal choice. The project also included advanced features like cork insulation and Tesla battery storage, ensuring the home is well-equipped to handle future energy price increases and changing climate conditions. This forward-thinking upgrade provides both comfort and long-term sustainability.

View more
portrait

We design and build containerised plant rooms in any size, colour or cladding options. These are perfect for commercial use. In this example two containerised plant rooms are being used as plant rooms that house the OCHSNER heat pumps and the external fan units are placed on a single gantry on top. The external space was previously unused and this solution meant that all the new refurbishment work could be done outside and not disturb the leisure centre day to day operation, nor did they have to find the space in the existing undersized plant room

View more
portrait
01

We helped decarbonise St Josephs School by replacing the old failing gas boiler with a new energy efficient OCHSNER Air 41 heat pump. Helping them reduce their bills at the same time. The school already had a large Solar PV array and voltage optimiser installed that complemented the changeover to a heat pump heat solution

View more
portrait
03

Get In Touch With The Big Heat Pump Company

Thank you!
Your submission has been received!
Oops! Something went wrong while submitting the form.